EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
JMillette
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (142)
Research
- (3)
-
Purchase of Full Kit...
-
Purchase of Tail Kit
-
The journey begins...
Workshop
- (3)
-
Clean up day
-
New lighting
-
Prep for A/C install...
Empennage
- (4)
-
Elevator pulleys
-
Continued working...
-
Side Walls and Top
-
Empennage Build started
Fuselage
- (19)
-
Electrical redo
-
Passenger Door
-
Final Fitting of...
-
Final Assembly of...
-
Pilot Door Final...
-
Painted Door frames...
-
Passenger side door
-
Sunroof Install
-
Installed windscreen
-
Built Pilot Door
-
lower cowl install
-
Completed paint of...
-
Tie downs and Cargo...
-
Upper front skin
-
Continued front...
-
Fuselage Continued
-
Joined the Fuselage
-
Corrected the mistake
-
Started work on the...
Firewall
Tail Feathers
- (15)
-
Contiued mounting...
-
Reskinned the Elevator
-
Stabilizer end cap
-
Finished up the Dorsal
-
Dorsal Fin and...
-
Mounted Tail
-
Vertical Stab
-
Completion Elevator
-
Started assembly of...
-
Completion on the...
-
Horizontal...
-
Horizontal...
-
Tail Kit Arrived and...
-
Completion of rudder...
-
Rudder Trial Fit
Wings
- (25)
-
Riveted wing tips
-
Reinstalled Wings...
-
Disassembly
-
Fairings
-
Fiberglass Fairing
-
Inner wing skins
-
Completed wiring in...
-
Riveted wing tips
-
Root Wing Skin
-
Completed wiring in...
-
Pilot Wing tip
-
Corrected dihedral
-
Struts and mounting...
-
Mounted wings
-
Left wing Completed
-
Left wing wire
-
Left wing debur and...
-
Left wing bottom skin
-
Started left wing
-
Completed wing tip...
-
Continued right wing
-
Right Wing
-
Started skeleton of...
-
Wings right Started...
-
Right wing continued
Controls
- (7)
-
Installed Flaperons
-
Flaperons
-
Building of Flaperon...
-
Parking Brake
-
Steering Linkage
-
Mocked up Rudder...
-
Mocked up...
Avionics
- (11)
-
CB Wiring
-
Panel and Electrical...
-
Panel option redue
-
Clean Slate
-
Radio installed
-
Radio installed
-
Mount for Headsets
-
Static System/BU...
-
Started wiring the...
-
New removable panel...
-
Received GRT...
Lighting
- (3)
-
Wiring from Wing to...
-
Installed Pilot...
-
Installed Landing...
Instrument Panel
- (7)
-
Batterys
-
Mounted new panel...
-
Cut out new panel.
-
EIS Sensor Terminal
-
Hobbs meter and Flap...
-
Switch panel and...
-
Panel Completed
Landing Gear
- (6)
-
Nose Strut Spacer
-
replaced the nose strut
-
Brake line covers
-
Nose Gear and Brakes
-
On the Gear
-
Painted Landing gear
Engine
- (14)
-
Cowl Continued
-
First Start of...
-
Electrical of...
-
Electrical...
-
Cowl Work
-
Engine Install:...
-
Engine install:...
-
Engine install:...
-
Corrected Radiator...
-
Radiator Plumbing
-
Installed engine...
-
Engine Install:...
-
Engine Unboxing
-
Ordered Eng. and...
Propeller
- (1)
-
Chip in prop
Fuel System
- (7)
-
Reconnected fuel lines
-
Re did fuel channels
-
Fuel tanks and fuel...
-
Viking Aircraft Fuel...
-
Fuel Trailer
-
Installed header tank
Interior Finish
- (3)
-
Color Scheme
-
Painted and...
-
installed sliding seats
Paint / Decals
- (11)
-
Decals Installed
-
Painted both wings
-
Painting Tail feathers
-
Made Decals for air...
-
Painted Glare Shield...
-
Primed and Painted...
-
Decals
-
Painted Exterior Trim
-
Prepped for paint...
-
Printed decal tests
-
Painted the interior
Inspection
Tools
- (1)
-
Building Fuel Trailer
Auto Entry
- (1)
Farings
- (1)
-
Farings
Builder Name:
Joseph Millette
-
Project:
Zenith
-
VIEW REPORTS
Total Hours:
1151
Total Flight Time:
Start/Last Date:
Jul 30, 2020 - Mar 31, 2022
Engine:
Viking 130
Propeller:
Whirlwind
Panel:
GRT 10.1 Sport
Friendly URL:
https://eaabuilderslog.org?s=JMillette
Home or Last Project Picture
Jan 16, 2022
Mounted Tail
- (16 hours)
Category: Tail Feathers
Over this past weekend i installed the horizontal and vertical stablizer. They are temp. Since i will be painting them while off the aircraft. Incidence of Horizontal is set to -0.9 deg. Which is with in. Tolerences of the plans. The mounting L-Angle is installed to allow mounting of the vertical stab to. The horizontal.
308738E7-E955-45A2-875F-6CAA812E3B70.jpeg
FCA142E1-D742-4651-BF02-0A3F6C76E23B.jpeg
0F224F33-F1FF-4B5F-89C0-8F98361D6030.jpeg
F7FEA130-BBDA-4CB2-BA3E-437B05B4C2A2.jpeg
0B89F1AC-B228-4D42-9FFD-A8FE2F36A9E2.jpeg
D3659263-E067-4CE8-8821-D7C6D1AD9D22.jpeg
67C736D5-D8BE-43A1-99F3-320999266A2F.jpeg
693AFD65-4630-4D54-A9B9-1A4E3B1D0A19.jpeg
2EED8767-6A34-45A9-8DEE-09BD0551E602.jpeg
F4865BFE-54D1-4F2E-AC81-4565CA6D9705.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.